Skip to content

You laid it. He'll stripe it.

Your striping sub is on the critical path at the exact point where everybody has already used up the float. What you need is somebody who shows up on the day and does not have to be chased.

Kleen Stripe subs striping to asphalt and concrete paving contractors and to new construction across Kansas. Layout from your drawings, ADA stalls to standard, fire lanes, and the markings the inspector is going to look for.

Send the plan and the date. If the date moves, say so and it moves.

Or put it in writing

For the lot you are looking at right now. Address and rough stall count help, but a name and a number is enough to start.

Send a photo of your lot and get a number back.

You do not need a site walk to start. Text a picture and the address, and you will get a real number instead of a range.